Skip to main content

Posts

The date format is incorrect in an Excel worksheet when you export in excel via RTC Client

Hi all, Today i created a processing only report in navision classic client which used to pull some data into excel. The format contain the date fields too. Now while running that report from classic client it works great but while running report from RTC client the date format was incorrect. If the report would have the field then i would have changed the date format in the RTC Report layout but that was not the case.

Unhandled thread exception caught. Exception while trying to create an instance of the Dynamics NAV integration pages

Hi all, After installing  Connector for Microsoft Dynamics NAV with CRM and during configuration we get below error message. Unhandled thread exception caught. Exception while trying to create an instance of the Dynamics NAV integration pages

NAV 2013 Upgrade Part II - Upgrading the Standard Objects.

Hi all, As discussed in previous post about  upgrading the customized objects , let's move ahead and see how to upgrade the standard objects. As the old standard process of Upgrade suggested by Microsoft, we need to compare and merge the changes in target. Lets see the steps for the same. The steps listed below may not be followed by all during upgrade but for me i find these steps the best way to upgrade which do leave any issues.

NAV 2013 Upgrade Part I - TextFormatUpgrade2013 Tool

Hi all, HAPPY DIWALI TO ALL THE READERS. Let's Talk about upgrading process to NAV 2013.  As we all know the pre-requisite version to upgrade is NAV 2009 SP1 / R2 and we all know how to upgrade from any older version to NAV 2009 SP1 / R2. I will break down upgrade process to NAV 2013 to multiple Post - 1)  Upgrading the customized Objects. 2)  Upgrading the Standard Objects. 3) Data Migration from SQL To SQL. 4) SQL Migration (as native database support is closed). Let me know if anyone require other information other then above listed points, will include them too.